zachboth89 karma
The machine in Connecticut can tunnel roughly 130 feet in 24 hours on a good day with three shifts working a day. The type of ground affects this speed a lot. It weighs approx 300+ tons.
zachboth85 karma
Coolest thing I've found has been whale teeth and a flake of gold. You find cool crystals regularly though.
zachboth64 karma
A TBM operator starts at low six figures. But so do many construction jobs that require experience.
zachboth122 karma
We have "shitters" (a technical term) inside the tunnel boring machine. In the old days, we use to put a toilet seat above the conveyer belt that took the rock out of the tunnel haha.