Highest Rated Comments


Blaneblane3 karma

Are you guys hiring? As an engineering student I've always wondered why pre-fab segments were never used in construction. Ideal and controlled mixes, perfect "weather" conditions for curing. Really neat stuff. Though, I am a little skeptical on how you could keep at 2%(or greater) grade from centerline without leaving a large gap down the center. Thanks for sharing! Awesome stuff.